Construction templates and exports:which files does Sitabula give you?
This page explains which files Sitabula produces. Every module has Download Excel and Download PDF buttons; timesheets, daily reports, interim payment summaries and more come out of your own project with one click. Below them are the app's import templates: use them to bring the work-item and material lists you already have into the app.
What the app exports
Every file comes in two languages: exports follow the language the app is running in.
Site
| File | What it holds | Format |
|---|---|---|
| Monthly timesheet register | Person × day grid, firm by firm; day totals and hours at row end, two signature boxes at the end | PDF · Excel |
| Worker summary | Name, ID number, subcontractor, start and end dates, days worked | Excel |
| Daily site report (the day's PDF) | Weather, reporter, headcount; each crew under its own heading, work listed by building, unit and area | |
| The month's daily reports | All of the month's reports in one workbook | Excel |
| Progress report | Building · Unit · Area · Subcontractor · Work item · Status; completion and the applied filter at the top | Excel |
| Schedule | The chart itself: bars, dependency arrows, late work, subcontractor workload below |
Technical office and materials
| File | What it holds | Format |
|---|---|---|
| Quantity take-off sheet | Header, the sheet and a live TOTAL formula; numbers stay numbers in Excel, units sit in the number format | Excel · PDF |
| Stock status | Material, unit, stock on hand, minimum level, average cost, stock value | Excel |
| Purchase order | The order document sent to the supplier | |
| Goods receipt note | The note for a batch received on site | |
| Concrete pours | Date, subcontractor, ticket number, location, class, cubic metres, amount, VAT; grand total at the end | Excel |
Finance
| File | What it holds | Format |
|---|---|---|
| Payment certificate | One A4 page: parties, line table, subtotal, VAT, grand total, two signature fields | |
| Interim payment register | Two sheets: who was paid how much, and for which work (building, unit, area, quantity, unit price) | Excel |
| Account statement | One firm's account, movement by movement | |
| Subcontractor scorecard | A subcontractor's details, agreements, payments issued, concrete and equipment totals, account balance | |
| Project cost summary | Everything spent on the project so far, on one page |
All Excel files share three things: the header row is frozen, filters are on, and dates and numbers are real cell values. List exports state at the top which filter they were taken with, so one subcontractor's register is never mistaken for the whole project.
Import templates
Three modules take bulk entry from Excel. The flow is the same in each: Download template, delete the sample rows and type your own data, choose the file, read the preview, confirm. Nothing is created until you confirm.
| Template | Where | Columns |
|---|---|---|
Work-item template (sitabula-work-item-template.xlsx) | Field Progress › Import | Building Name · Unit Name · Area Name · Work Item Name (required) · Subcontractor · Status · Note |
Material template (sitabula-material-template.xlsx) | Inventory › Import | Material Name (required) · Unit · Category · Min. Stock · Description; Material code · Barcode where material codes are on |
Take-off template (Takeoff_Template_….xlsx) | Quantity Take-offs › Import from Excel | The open sheet's column headings; paste data from the second row |
- 01
The work-item template counts new buildings, units, areas and subcontractors in the preview; a subcontractor not yet in the project is created. The Status column has a drop-down. You name the three levels for each project.
- 02
The material template preview counts materials already in the project, duplicates in the file and rows with errors separately; a row that will not be imported is marked with the reason.
- 03
For take-offs the template is optional: you can choose your own Excel file. If the headings are recognised, columns match by name; the preview tells you how many formulas were converted.
- 04
For the schedule there is no template; Schedule reads an MS Project XML file (
.mppis not read directly; save it as XML).
The templates recognise both languages: a file downloaded in English can be imported by a colleague using the app in Turkish. Don't delete or rename columns; a file whose headings don't match is not read, and the app asks you to download the template again.
On the free plan the project structure is limited to 1 building, 1 unit and 2 areas; importing a large work-item list needs a subscription.
Frequently asked
Is there an import template for timesheets?
No. The workforce is entered once; the month's days go into the list, and "Bulk fill" enters all days of the month or weekdays in one go.
Can I bring my interim payment spreadsheet in?
Interim payments are not retyped: lines come from site work items, equipment records and agreements.
Can I get the exports in Turkish?
Yes. Switch the app's language to Türkçe and export again.
Do I need edit permission to export?
In most modules, no; view permission is enough.