From spreadsheets to Sitabula

A construction spreadsheet alternative:the same number, one record.

Timesheets in a notebook, take-offs in a spreadsheet, delivery tickets in the truck, photos in a group chat. Each works on its own; the trouble is that at month end the same number turns up in three versions. In Sitabula a record is entered once, and interim payments, inventory, accounts and reports all read it. You don't have to give up Excel either: lists export to Excel, and some of your files can be imported.

01 Mapping

Which spreadsheet job goes where

What you keep todayIn SitabulaBringing your file in
TimesheetTimesheetsEnter the workforce once; type days into the list, or "Bulk fill" all days or weekdays at once
Take-off sheetQuantity Take-offsImport from Excel: template or your own file; the preview shows matched columns and converted formulas
Building / unit progress trackerField ProgressImport: work item template; new buildings, units, areas and subcontractors are counted in the preview. You name the three levels for each project (e.g. Block / Flat / Room, Building / Floor / Area, or your own names)
Construction scheduleScheduleMS Project XML (up to 3,000 activities, 25 MB); .mpp is not read directly, save as XML
Material list, warehouseInventoryImport: material template; the preview counts conflicts, duplicates and invalid rows
Quote comparison sheetOrder ManagementOpen a request, enter quotes, compare them side by side
Delivery ticket logDeliveries, Concrete TrackingReceipts are entered on site; concrete tickets with each pour
Payment spreadsheetInterim PaymentsNot retyped: items come from site work, equipment entries and agreements
Subcontractor account sheetAccountsInterim payments, priced concrete pours and received goods post to accounts
Daily report bookDaily ReportOne report per day; missed days show on the calendar
Equipment logEquipment TrackingDaily work entries, added to interim payments

Every import has a preview, and no record is created until you confirm.

02 Excel

Back to Excel

Most lists have Export to Excel and Export to PDF. In the Excel file the header row is frozen, filters are on, and dates and numbers are real cell values you can sort, sum and pivot. The file states the filter it was taken with, so one subcontractor's statement is not mistaken for the whole project.

03 Getting started

Where to start

  1. 01

    Open the project and set up your subcontractors.

  2. 02

    Start with your tidiest file: a take-off sheet or a work item list.

  3. 03

    Keep this month's timesheets and daily reports in Sitabula.

  4. 04

    At month end, issue the interim payment in Sitabula and export the certificate as PDF.

On the free plan the project structure is limited to 1 building, 1 unit and 2 areas; importing a large work item list needs a subscription.

Step by step: Guide › Field Progress, Quantity Take-offs, Inventory.

Open your first site today.

Sign up and open your project free; invite your team with a subscription. No time limit for one project.